Table of Contents
RBC and Interlocking Hardware
Even if the planned features of the RBC and interlocking hardware included control of signals and points, this part of the project simply didn't get that far for reasons described below (and lack of time, of course).
Overview
The RBC and interlocking hardware will include (at least):
- Radio link to trains
Operator Panel- Controller for track side elements
Semafor signalsLight signalsPoints- Level Crossing
- Ethernet connection for Web interface
Element controller
- Controller for Semafore signals and points. Power supply and relay broken due to over voltage at capacitor
Diagram
e