Implementation

Track

Train

Two LGB trains type “Stainz 2020” were modified and equipped with OBU.

  • The “Circus Train”
  • The “Cargo Train”

Supporting modules

HW structure

The figure to the right provides an overview of the modules forming the Winter Train v2. In the upper left corner of each box is shown which type of hardware is used. Each module, the radio network and the wired network are described in the following:


it/wintertrainv2/implementation/start.txt · Last modified: 2017/10/13 15:08 by jabe