Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
it:wintertrainv4:design:feature_system [2020/01/05 10:03]
jabe [System]
it:wintertrainv4:design:feature_system [2020/01/05 10:21] (current)
jabe
Line 3: Line 3:
 Besides the core functionality of the WinterTrain system - controlling trains - various features are needed in order to engineer a project and - once build - to keep the system running. These are described in this section. Besides the core functionality of the WinterTrain system - controlling trains - various features are needed in order to engineer a project and - once build - to keep the system running. These are described in this section.
  
-===== The running system ​=====+===== Engineering Tools ===== 
 +The engineering tools will be used to generate and organize the necessary specific data for each project (that is: actual model railway). The tools will allow for generating the final data for a running system based on graphical drawings, lists etc.:
  
 +  * Scematic Signalling Layout - showing the sequence of all track elements.
 +  * Screen Layout - Layout specification for the HMI
 +  * Train Data - Specifying properties of each train
  
-==== User authentication ==== +Engineering output: 
-To be implemented in a future version. FIXME +  * PT2 data for RBCIL 
- +  * Time Tables for TMS 
-==== Monitoring ==== +  * Shunting area specification ​for OBU
- +
-  * Supply voltage of traction power +
-  * Status of each EC (configuration,​ up time, ...) +
-  * RBC and TMS status +
-  * Supply voltage (or presence) of point machine power +
-  * Position feed-back ​for point machines +
- +
-Various system status will be indicated via the Maintenance Center "​MCe"​ FIXME +
- +
- +
-==== System start ==== +
-FIXME +
- +
-===== Engineering Tools =====+
  
 DMT FIXME DMT FIXME
Line 55: Line 45:
  
 The tool will read data files in current directory unless otherwise specified. The tool will read data files in current directory unless otherwise specified.
 +
 +
 +===== The running system =====
 +
 +==== System start and restart ====
 +Means for system start and restart. FIXME
 +
 +==== User authentication ====
 +To be implemented in a future version. FIXME
 +
 +==== Monitoring ====
 +
 +  * Supply voltage of traction power
 +  * Supply voltage (or presence) of point machine power
 +  * Status of each EC (configuration,​ up time, ...)
 +  * RBC and TMS status
 +
 +System status like these will be indicated via the Maintenance Center "​MCe"​ FIXME
  
  

it/wintertrainv4/design/feature_system.txt · Last modified: 2020/01/05 10:21 by jabe